Surveillance procurement
4 documents on file, spanning 2018–2023. The chain below starts with the original agreement; each document beneath it shows what it changed.
What the governing body was told before it voted, what it actually enacted, and what was signed — term by term. Click any value to read the passage it came from. A row marked silent is not a disagreement: it means only some of the three sources address that term at all, which is a different criticism and sometimes a fairer one.
Not on file: enactment. No ordinance or resolution authorising this contract has been located, so what the governing body approved cannot be compared against what was signed. That is a statement about the record we hold, not a finding that no vote occurred.
| Term | Staff report | Enactment | Contract | Verdict |
|---|---|---|---|---|
| Data retention | — | Differs | ||
| Plate readers | — | — | Silent | |
| Annual cost | — | — | Silent | |
| Term | — | — | Silent | |
| Renews automatically | — | — | Silent | |
| Addresses data sharing | — | — | Silent | |
| Sharing with others | — | — | Silent | |
| Addresses federal access | — | — | Silent |
No source addresses: total cost. Neither the briefing, the enactment nor the agreement puts these on the record.
Not on file: enactment. No ordinance or resolution authorising this contract has been located, so what the governing body approved cannot be compared against what was signed. That is a statement about the record we hold, not a finding that no vote occurred.
| Term | Staff report | Enactment | Contract | Verdict |
|---|---|---|---|---|
| Sharing with others | — | Agree | ||
| Data retention | — | — | Silent | |
| Addresses data sharing | — | — | Silent |
No source addresses: plate readers, total cost, annual cost, term, renews automatically, addresses federal access. Neither the briefing, the enactment nor the agreement puts these on the record.
Not on file: staff report, enactment. No ordinance or resolution authorising this contract has been located, so what the governing body approved cannot be compared against what was signed. That is a statement about the record we hold, not a finding that no vote occurred.
| Term | Staff report | Enactment | Contract | Verdict |
|---|---|---|---|---|
| Total cost | — | — | Silent | |
| Sharing with others | — | — | Silent |
No source addresses: data retention, plate readers, annual cost, term, renews automatically, addresses data sharing, addresses federal access. Neither the briefing, the enactment nor the agreement puts these on the record.
4 systems named in this jurisdiction’s procurement documents, 2 of which are documented as integrating with FlockOS. Plate readers are one layer; what a camera network is worth to an agency depends on what it is plugged into.
“d-conditions ), as well as the attached Statement of Work (SOW) for Axon Fleet and/or Axon Interview Room purchase, if applicable. In the event yo”the document
“h time communication is restored ✓ 15. System must be minimally compatible with GeTac systems ✓ 6. Training and Tech Support (maximum 75 pts.) Requirement Avail”the document
“he PD reviewed all packets and unanimously selected Flock as their preferred vendor Why Flock Safety? Footage owned by the City and will never by sold or shared by Flock Customizable data r”the document
“ne (1) year warranty for manufacturer defects. 5. Software is manufactured under strict Vigilant Solutions standard. 6. This Quote is provided per our conversation & details given by you - not in”the document
These are the systems named in the procurement documents we hold. A system listed here was written down in a document this jurisdiction published; that is not the same as a finding that the jurisdiction operates it, and a system missing from this list may simply have been bought under an item we have not read.
A gap means the record was not found on the jurisdiction's public portal. It is not a statement that the record does not exist, and it is not a statement about whether the jurisdiction operates ALPR.
Source portal: https://alameda.legistar.com. Last swept 2026-08-31.