Perfect World
Acequias

Acequias · New Mexico · Fieldguide

El Rito Acequia Association

3 ditches the state has mapped in this region · Rio Arriba County.

El Rito Acequia Association
Ditch (3)
What this page is, and is not
Every line and point here is a feature the Office of the State Engineer publishes, placed inside this region by its own geometry — nothing is drawn or assigned by hand. The state maps 3 ditches here and names 0 of them. That is a count of what one dataset records, not a count of how many acequias run in this valley — the OSE's named-acequia layer covers some regions richly and others barely at all. Where this page is thin, the valley is not.

Notices on this desk

Mora County: two acequias are fighting a state cut to their irrigation water

Las Acequias de Cañoncito y Encinal say the Office of the State Engineer ordered their headgate closed and set a valley-wide water allowance well below what their own hydrologist found the land needs.
Mora County
Read →

Drought in this county

Rio Arriba County, New Mexico
On the 2026-08-25 map, 100% of the county was in moderate drought or worse, 100% in severe or worse, and 31% in D4, exceptional drought. U.S. Drought Monitor, retrieved 2026-08-31.

How much of Rio Arriba County, New Mexico has been in drought

Share of Rio Arriba County, New Mexico in severe drought or worse (D2–D4), weekly, 20002026. Source: U.S. Drought Monitor (National Drought Mitigation Center, USDA, NOAA). Categories are published cumulatively.

0%50%100%20022008201420202026

What this desk covers

An acequia is a community-governed irrigation ditch. In New Mexico it is also a political subdivision of the state, with elected commissioners and a mayordomo, and many of them are older than the state, the territory, and the counties drawn around them. Their business happens at the ditch, at the county, and at the Office of the State Engineer — almost never at a city council, which is why the rest of this site cannot carry it.

Office of the State Engineer (OSE)
The state agency that administers New Mexico's water rights, issues permits, and enforces compliance orders.
Adjudication
The court process that decides, for every user on a stream system, how much water they have a right to and how old that right is. Seniority decides who gets water in a dry year.
Consumptive Irrigation Requirement (CIR)
The state's estimate of how much water a crop actually consumes on an acre in a given place, in acre-feet per year. In an adjudication it becomes the ceiling on a water right — so the number itself is often what the fight is about.
Headgate
The gate where a ditch takes water from the river. Ordering one closed stops the whole ditch.

Where to get real help

Perfect World is not a law office and nothing on this desk is legal advice. These are the people who actually do this work.

Keep reading

Ditches, diversions, region boundaries and adjudications: New Mexico Office of the State Engineer, OSE GIS — OSE Conveyances, retrieved 2026-08-31. Geometry simplified for display; nothing moved, nothing invented. Not a survey product.